Requirements:
  • New data centre for an international bank
  • Constantly homogeneous cold air for all servers with low energy consumption
  • Future-proof cooling, power and cable management
  • User-friendly for facility management and IT
   
The solution:
  • Cold aisle containment to reduce energy consumption
  • Automated, fully glazed double doors minimise leakage of cold air
  • Highly-perforated floor panels for maximum air passage
  • Transparent top cover elements allow use of room lighting into the contained aisle
  • Aisle roof panels fitted higher than the cabinets, for headroom and a sense of space
  • Cable duct integrated into aisle roof panels, accessible from cold aisle
  • Additional cable ducts along cabinet top covers